Mobile Power Box - Swiss mobile waterpower electricity

Economics

All components are checked for functionality and completeness before shipping through Mobilepowerbox. Thanks to the short assembly time, low-maintenance cost operation and high availability during operation, the MBP has optimal economics for its user. MPB is, compared with conventional hydroelectric plants, a low-cost model in manufacturing and operation as well.

Cost / Benefit

At optimum operation and performance of 27 kW, an annual production of 230,000 kWh and the total investment of € 200,000 this equals to a total of € 0,869 per installed kW.

HE hydro eletricité SA
Piazza Cioccaro 8
CH 9601 Lugano
Switzerland

Tel. +41 41 760 30 40